The Roster

Saturday, July 23, 2011

Choo Choo!

Big news today!
I've got the first loop of track installed AND I've successfully run a locomotive all the way around the layout.
That is the good news.

The bad news;

Its power with temporary wiring.
There are still two more loops to go
Lots of landscaping to do!

Soooo...the good news is that I run a train around the track.

It might be time to install an ad hoc control panel and run the permanent wiring.