Got a nice break in the winter weather and was able to spray paint the bridge. Now for the weathering and then I can install it on the layout.
While I work on that, I'm also hard at work creating the hill forms for the base of the cliff at the north end of the layout. Its about five feet of very short slope at the base of the cliff. Construction method is the classic cardboard basket weave frame with plaster cloth layered over top.
No comments:
Post a Comment