Friday, February 17, 2012
U33C, not so blue
Got the U33C back from the shop. It runs much quieter now. I ran it around the layout a couple of times and it seems to work fine. Didn't test the smoke unit yet, but it runs, the lights work and the sound is phenomenal. I'll post some picures/video this weekend.
Tuesday, February 14, 2012
More pictures of the bridge
Spent some time working on the abutments and pier for this bridge on the outer loop of track. Since some folks have expressed an interest in seeing pictures, here you go!
These are Lionel 'short span' bridges made of plastic. I've painted they in various shades of grey with varying degrees of weathering and drybrushing designed to bring out the highlights.
As I'm sure is obvious, I have yet to tackle finishing the painting and filling of the streambed.
These are Lionel 'short span' bridges made of plastic. I've painted they in various shades of grey with varying degrees of weathering and drybrushing designed to bring out the highlights.
As I'm sure is obvious, I have yet to tackle finishing the painting and filling of the streambed.
Sunday, February 12, 2012
Back on track!
Laid in the final track for the outer loop and ran a number of locomotives and short trains across it for testing. Its looking pretty good! All the locomotives traversed the curves and the grades with no noticeable movement problems. At least none of them rolled off the tracks!
The homasote roadbed over the styrofoam risers is not as quiet as I'd hoped. I'll investigate other sound deadening options as I work on landscaping the layout.
The big surprise was testing the GP 35 on the outer loop and being startled as the Lackawanna 4-8-4 chugged by on the middle loop. Seems that connections and power transfer and excellent at the junction switches between the two loops. Now I'll have to bone up on wiring to insulate the two loops from each other.
The homasote roadbed over the styrofoam risers is not as quiet as I'd hoped. I'll investigate other sound deadening options as I work on landscaping the layout.
The big surprise was testing the GP 35 on the outer loop and being startled as the Lackawanna 4-8-4 chugged by on the middle loop. Seems that connections and power transfer and excellent at the junction switches between the two loops. Now I'll have to bone up on wiring to insulate the two loops from each other.
Saturday, February 11, 2012
Off track
Just about finished the outer loop. I ran two tests to check clearances by rolling some of the longer/larger rolling stock over the track and found...discrepancies. One I can live with - a rough join between track sections. But the other...the cars goes into a curve and just...stop. Worse, this is the curve in the very back of the layout.
This one will take some detective work. The leading theory is there is just a lot of friction being generated in the turn. But its supposedly a gentler turn than the middle loop and its on a grade. But friction overcomes gravity.
I'll be playing around with it some more. My worry is that as a train goes through the curve the additional drag could cause uncoupling or derailments.
This one will take some detective work. The leading theory is there is just a lot of friction being generated in the turn. But its supposedly a gentler turn than the middle loop and its on a grade. But friction overcomes gravity.
I'll be playing around with it some more. My worry is that as a train goes through the curve the additional drag could cause uncoupling or derailments.
Monday, January 30, 2012
Tom Sawyer and the fence
Got a nice break in the winter weather and was able to spray paint the bridge. Now for the weathering and then I can install it on the layout.
While I work on that, I'm also hard at work creating the hill forms for the base of the cliff at the north end of the layout. Its about five feet of very short slope at the base of the cliff. Construction method is the classic cardboard basket weave frame with plaster cloth layered over top.
While I work on that, I'm also hard at work creating the hill forms for the base of the cliff at the north end of the layout. Its about five feet of very short slope at the base of the cliff. Construction method is the classic cardboard basket weave frame with plaster cloth layered over top.
Sunday, January 29, 2012
Why building a layout takes so long (part 2)
I'm up to the last bridges for the outer loop. I've got the bridge pier installed and painted a useable color. I'm about to tack down the bridges when I realize that;
a.) the streambed still is not sealed and painted.
b.) One of the bridges is not yet painted (still in its original plastic glossy black finish)
c.) its too cold and windy to spray paint outside.
so....put the outer loop project on hold for a day or two and move on to laying roadbed for the inner loop!
a.) the streambed still is not sealed and painted.
b.) One of the bridges is not yet painted (still in its original plastic glossy black finish)
c.) its too cold and windy to spray paint outside.
so....put the outer loop project on hold for a day or two and move on to laying roadbed for the inner loop!
Tuesday, January 24, 2012
Subscribe to:
Posts (Atom)